Existing Brent House |
The proposal |
The proposed development would be between the new Elizabeth House and Ark Elvin Academy, which is due to be re-developed LINK, and will stretch back towards the playing fields and St Joseph's Primary school.
It will consist of tw building sof between 8 and 10 storeys with retail/commercial space on the groubnd floot. The 248 dwellings will consist of 84 one bedroomed flats (although that might be reconsidered), 108 2 bedroom, 49 3 bedroom and 7 4 bedroom.
30% will be affordable rather than the 50% figure in Brent's strategic Plan. Henley Homes argued that above 30% would not be viable in terms of the return to the builders and Capita confirmed this figures.
It is projected that there will be 104 children in the development and play space is planned for, although the total amount of utdoor space is less than would be expected for this scale of development. Planners were told that this was constrained by the nature of the site and its quality compensated for the lower figure.
TfL will need to review bus transport in the area due to the additional population.
The mature trees, a feature of the site, (see top picture) will be lost in the redevelopment.
Wembley Central councillors submitted no comments on the proposal.
The plan - High Road at the top |